<?xml version="1.0" encoding="UTF-8"?><rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
	>

<channel>
	<title>Transform Energy Maintenance &#187; Uncategorised</title>
	<atom:link href="http://www.transformenergy.co.uk/category/uncategorised/feed/" rel="self" type="application/rss+xml" />
	<link>http://www.transformenergy.co.uk</link>
	<description>Transform Energy specialise in: High Voltage Switchgear Maintenance, Transformer Oil Purification Systems, Transformer Painting and More!</description>
	<lastBuildDate>Thu, 25 Aug 2016 09:52:58 +0000</lastBuildDate>
	<language>en-GB</language>
	<sy:updatePeriod>hourly</sy:updatePeriod>
	<sy:updateFrequency>1</sy:updateFrequency>
	<generator>https://wordpress.org/?v=4.2.38</generator>
	<item>
		<title>Transformer Oil Testing &#124; Lafarge Cement</title>
		<link>http://www.transformenergy.co.uk/transformer-oil-testing-lafarge-cement/</link>
		<comments>http://www.transformenergy.co.uk/transformer-oil-testing-lafarge-cement/#comments</comments>
		<pubDate>Fri, 22 Jul 2016 13:18:09 +0000</pubDate>
		<dc:creator><![CDATA[admin]]></dc:creator>
				<category><![CDATA[Uncategorised]]></category>

		<guid isPermaLink="false">http://www.transformenergy.co.uk/?p=273</guid>
		<description><![CDATA[Following annual laboratory &#8220;transformer oil testing&#8221; at Lafarge Cement, waterhouses. It was noted that several transformers failed to meet the required British standards for KV strength and moisture content. With effective &#8220;transformer oil filtration&#8221; the insulation oil was bought back &#8230; <a href="http://www.transformenergy.co.uk/transformer-oil-testing-lafarge-cement/">Continue reading <span class="meta-nav">&#8594;</span></a>]]></description>
				<content:encoded><![CDATA[<p>Following annual laboratory &#8220;transformer oil testing&#8221; at Lafarge Cement, waterhouses.</p>
<p>It was noted that several transformers failed to meet the required British standards for KV strength and moisture content.</p>
<p>With effective &#8220;transformer oil filtration&#8221; the insulation oil was bought back within  standard, this was a manned and monitored one day procedure per transformer carried out on site at a fraction of the cost of replacing the insulation oil.</p>
<p>Chief electrical engineer Justin Welford was delighted with the results as following our filtration method the insulation oil standard was actually above that expected of new insulation oil.</p>
<p>It was also an environmentally friendly procedure, negating the need to dispose of the existing oil and the transportation of new insulation oil to site.</p>
<p>The procedure can also be carried out &#8220;live&#8221; without power interruption giving our customers peace of mind their operation can continue to run smoothly while essential and critical works are carried out.</p>
<p>Lafarge Cement are a valued customer of Transform Energy and enjoy a close working relationship.</p>
]]></content:encoded>
			<wfw:commentRss>http://www.transformenergy.co.uk/transformer-oil-testing-lafarge-cement/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
	</channel>
</rss>
